Friday, October 31, 2008
Windows in place
The framers returned and put all the windows in, except for two in the front by the entrance. We chose a cranberry metal cladding on the outside and VG fir on the inside.
We are still struggling with the foundation tie downs and drilling through bottom of the framing and into the concrete. Rebar is getting in the way.
Tuesday, October 28, 2008
Wrapped Up
Saturday, October 25, 2008
We're covered!
Sunday, October 19, 2008
Framing finished
The covered areas over the front door and outside the family room are finished.
The pillars in the front will have stone bases around the concrete bottoms.
The upstairs decks now have plywood decking. We plan to cover with a waterproof membrane and place tiles as the final flooring.
Jon poured a great aggregate concrete patio outside the family room so that we have a covered area to sit outside on drizzly days.
Ken used his new band saw (another boy toy) to add detail to the wood beams at the end of each patio cover.
Wednesday, October 1, 2008