Sunday, October 19, 2008

Framing finished




The covered areas over the front door and outside the family room are finished.
The pillars in the front will have stone bases around the concrete bottoms.
The upstairs decks now have plywood decking. We plan to cover with a waterproof membrane and place tiles as the final flooring.


Jon poured a great aggregate concrete patio outside the family room so that we have a covered area to sit outside on drizzly days.




Ken used his new band saw (another boy toy) to add detail to the wood beams at the end of each patio cover.

No comments: