Behind the scenes work continues...
Ken has successfully installed the auxiliary water heater in the master bath, giving us instant hot water since the bath is quite a distance from the water heater.
The master bath is operational now-- sinks, shower and toilets are all installed and working!
I have been working on finishing the windows, doors and stairs with tung oil. It will take several coats to get the proper finish.
Ken has installed the outside electrical outlets and covered the wires that eventually will be outlets on the yet to be constructed window seat in the living room. (The window seat is not needed for an occupancy permit-- but loose wires are frowned upon.)
Sunday, May 30, 2010
Floor plans
Wednesday, May 26, 2010
Fireplace progress
Tuesday, May 11, 2010
Stonework on fireplace begun
Monday, May 10, 2010
Moving the "rock"
Today was a feat of super-human strength. We had to move the big birthday "rock" (hearth stone) from the garage to the second floor fireplace. To do that required 4 strong men, a "custom" wood gurney and two supervisors (Ken and me) to watch out for corners and walls. There was a lot of red-faced grunting and groaning, but the deed was done, and the hearthstone is in place.
Up and over the banister!
The gurney... like carrying Cleopatra.
The hearth stone in place. This rock is NOT going anywhere now.
Up and over the banister!
The gurney... like carrying Cleopatra.
The hearth stone in place. This rock is NOT going anywhere now.
Sunday, May 9, 2010
More behind the scenes work
I have been working on the woodwork, applying Tung Oil to the fir that has not been previously treated. Not much to see yet... and Ken has been working on installing floor electrical outlets and the fixtures in the guest bathroom. Will post pictures when finished.
Saturday, May 8, 2010
More progess on fireplace
Friday, May 7, 2010
Deck railing
Thursday, May 6, 2010
Hot Water!!!
Wednesday, May 5, 2010
Fireplace mantel
Tuesday, May 4, 2010
Getting stones ready
Sunday, May 2, 2010
Behind the scenes
Lots and lots of rock
Saturday, May 1, 2010
Fireplace progress
Bob H. worked on the framing for the fireplace, so now it is ready for adding the stone face to it.
We made another trip today to get the stone veneer for the fireplace. The island truck served us quite well this time.
We now have 100 square feet of rock and 20 linear feet of corner stones in the back of the truck. They were put in with a forklift. Our job now is to figure out how to get them out of the truckbed. :)
Below is a sample of the stone and how we envision it on the fireplace.
We made another trip today to get the stone veneer for the fireplace. The island truck served us quite well this time.
We now have 100 square feet of rock and 20 linear feet of corner stones in the back of the truck. They were put in with a forklift. Our job now is to figure out how to get them out of the truckbed. :)
Below is a sample of the stone and how we envision it on the fireplace.