Behind the scenes work continues...
Ken has successfully installed the auxiliary water heater in the master bath, giving us instant hot water since the bath is quite a distance from the water heater.
The master bath is operational now-- sinks, shower and toilets are all installed and working!
I have been working on finishing the windows, doors and stairs with tung oil. It will take several coats to get the proper finish.
Ken has installed the outside electrical outlets and covered the wires that eventually will be outlets on the yet to be constructed window seat in the living room. (The window seat is not needed for an occupancy permit-- but loose wires are frowned upon.)