Monday, September 7, 2009

Getting Ready for Sheetrock

We spent the Labor Day holiday getting the new Manor ready for the sheetrock installation which starts tomorrow. I swept out all the wood shavings and loose insulation and Ken finished up the wiring and other details. The sheetrock arrived last week. It was quite interesting watching them unload it.



The crane lifting the sheetrock to the second floor. (We got them to load the pellet stove into the house too.)


Piles of sheetrock waiting to be installed. Some in each room. They are 12 foot lengths.




No comments: